Appliance / Equipment Quantity Power Rating Usage (hrs) / Day Total Watts

TR Formula: Equivalent Watts = (TR ร— 3516.85 W) รท COP.

Sum of Electrical Loads 0.00 W Total of all Quantity ร— Power Rating values.
30% Buffer 0.00 W Additional allowance equal to Sum of Load ร— 0.30.
Total Load with 30% Buffer 0.00 W Recommended design basis: Sum of Load ร— 1.30.

Note: Select W, hp, or TR in the Power Rating column. If hp is selected, it is automatically converted in Watts using 1 hp = 745.7 W. If TR is selected, the equivalent wattage is computed as (TR ร— 3516.85 W) รท selected COP. The summary above automatically displays the total electrical load, 30% buffer, and total load with buffer.
Slide the table horizontally on mobile devices to view all columns.

๐Ÿ”‹ Battery Sizing

Battery Voltage 48.00 V Selected battery bank voltage.
Required Capacity 0.00 Ah Ah = Required Wh รท Battery Voltage.
Required Energy 0.00 kWh kWh = Total load with 30% buffer ร— autonomy hours รท 1000.

Battery sizing formula: Required Energy, kWh = Total Load with 30% Buffer ร— Autonomy Hours รท 1000. Required Capacity, Ah = Required Energy, Wh รท Battery Voltage. This is a preliminary sizing guide only; final sizing may still consider inverter efficiency, battery depth of discharge, battery chemistry, aging factor, and site-specific requirements.

๐Ÿ—๏ธ Roof Information

๐Ÿ”‹ Additional Requirements

๐Ÿ“Ž Upload Site Photos / Files

Upload guide: You may upload roof photos, electric bill, meter photo, main breaker photo, and other site assessment files. Files will be saved under /uploads/Name-Owner/.

Accepted: JPG, PNG, WEBP, PDF. You may select multiple files.